Infant daycare prices near me: Cost of Care – Child Care Aware MN

Опубликовано: October 5, 2023 в 10:55 am

Автор:

Категории: Miscellaneous

Full Day Daycare and Childcare rates/prices in Florence for infants

I have been calling a handful of childcare/daycare prices/rates for my 1 year old since May 2017. I think the rates are safe to apply for any child between the ages of 3 months – before kindergarten (between 4 or 5 years old). This is for full day care. To save you some trouble, here are my findings. 

Saint Paul United Methodist Church – Their all day care is between 6:45am – 6pm and the cost is $125 per week so that equates to about $500 per month, per child. This includes breakfast, lunch and all snacks. (843) 669-3134

Central United Methodist Church Preschool – Edit for 2018: Central United Methodist Preschool’s regular program is from 9AM – Noon and you can extend the care to 2:30pm as part of their lunch brunch program and until 4:30PM for another additional cost. Please call them to double check if anything has changed. Their program gets full very quickly! This is maybe not the best place for full time day care if you work beyond 4pm.  

La Petite Academy –
Their all day childcare is from 6AM – 6PM with breakfast, morning snack, lunch, and afternoon snack included. This is a chain and they are located all over the US. They follow a great preschool structure that’s appropriate by age and the chain itself has been around for decades. They also provide an after school program for kids in elementary school. The quote I was given was $154 per week for full time care for my little ones for Mon-Fri. This rate might have increased a bit. They are located in West Florence. Address: 3501 Pine Needles Rd, Florence, SC 29501 Tel: (843) 662-9808. Price is around $616 a month. 

South Florence Baptist Daycare – Their all day care is from 6:30am – 6pm and cost is $111 per week. It is for ages 6 weeks old – 4 years old. They have individual classrooms for each age level and offer the A-Beka Christian Curriculum. They provide a hot breakfast, lunch, and snacks – all included in your child’s tuition cost. They also use separate age-specific fenced playgrounds.

Charlie Brown Day Care – Their all day care is $125 a week so that is about $500 a month. (843) 665-1226. They are the closest to FDTC (about 10 min) in the group of daycares that I researched. Address: 1800 Gregg Ave., Florence, SC 29501. 

Sunshine House – Their full time care is $155 a week, so that is about $620 a month. Address: 2009 Second Loop Rd., Florence, SC 29501. Meals and snacks are all included. 

First Presbyterian Church Child Development Center – From 7am – 6pm year round, the child development center provides all day care for $135 a week, which is about $540 a month. Mid-morning snacks, lunches and afternoon snacks are included. It is for ages 6 weeks – 4k. Address: 700 Park Ave., Florence, SC 29501

Immanuel Baptist Church Child Care – Their full time care is $122 a week from 7am – 6pm, which is approximately $488 per month.
Address: 306 Cherokee Rd., Florence, SC 29501 Tele: (843) 665-9004

I will update this page with more details as I continue my search for the right daycare for my child. I hope this is helpful! Note that prices may have increased since I’ve called these places. Please note that each month has more than 4 weeks but I used 4 weeks as my calculation to compare the rates with each other.

Affordable Daycare | Bright Horizons®

Then, think about how much of your household income you can spare for child care. When you get to crunching the numbers, you might find you have more available in your budget than you initially thought. Plus, tax credits, tuition subsidies, and more can help you find an affordable daycare provider.

Use a combination of these strategies — some potentially obvious, others more creative — to find a high-quality and affordable daycare for your child. And, as always, keep waitlists in mind and start your search as early as possible.

Ask Around

The first thing you should do is simply ask around your community. The best recommendations often come from people you know. Friends, family members, coworkers, neighbors, and even that friendly clerk at the grocery store can point you in the right direction.

Get a Subsidy

You might qualify for a child care subsidy. Each year, federal, state, and even local authorities allocate a certain amount of funds to help families with child care expenses. Qualification requirements vary by state, so be sure to check yours.

Apply for Assistance

Child care assistance — similar to a subsidy — is another state-run program you might qualify for. Most states provide financial assistance for child care to low-income families. With child care assistance, you’ll typically pay a portion of the expenses, while the program pays for the rest.

Start a DCFSA

Some employers offer a Dependent Care Flexible Spending Account (DCFSA), which allows you to contribute part of your pre-tax income to an account used to pay for child care expenses. And this has an added bonus of lowering your tax liability! Keep in mind that a DCFSA must be used to pay for work-related child care expenses — it can’t be used for child care provided outside of your work schedule.

Take Advantage of a Tax Credit

When tax season comes around, you might be able to cash in on the Child and Dependent Care Credit. It’s income-based, so the lower your income, the higher the credit will be.

Plus, your tax liability might get reduced so much that you end up with a refund!

However, note that you can’t open or fund a DCFSA and use the child care tax credit in the same tax year, so be strategic.

Ask About Rates and Discounts

Your child’s daycare center or potential future center might offer sibling discounts or discounts for paying the tuition in full, up front. They might also offer discounts for veterans, active-duty military service members, teachers, first responders, and more. Special rates and discounts can help you find a much more affordable daycare.

Explore Your Benefits

Take a look at the child care benefits your employer offers and/or talk to an HR rep at work to see if there’s anything your company can do to help with child care costs. Some employers offer subsidized child care, affordable daycare in on-site or near-site centers, nanny placement, and more.

Do a Daycare Comparison

Are you looking at more than one center in your area? Affordability shouldn’t be the only factor — you also want to be sure the daycare you choose meets your child’s needs, makes your family feel comfortable, and more. Tour different centers to find an affordable daycare that’s high-quality, too.

 

ZhK Polyarnaya 25, prices for apartments in the new building Polyarnaya 25 on the official website of PIK 5, available

Studio

1

2

3+

from

6 547 860

to

900 06 27 072 670

225 offers

About the project

The residential quarter “Polyarnaya 25” is located in the north of Moscow. Babushkinskaya metro station is 15 minutes away by public transport or by electric scooter — there are four scooter parking lots next to the project. The project includes ten residential buildings, two kindergartens, a school, underground and multi-level parking lots.

This is a cozy residential quarter, where there is everything for a comfortable life. From each house there is an exit to a closed courtyard-park, where cars do not drive and random passers-by do not walk. This is a peaceful place to relax, read a book and practice yoga. There are sports grounds with exercise machines in the yard – it is convenient to do exercises in the fresh air right next to the house. And for children, we will build playgrounds from natural and safe materials.

Shops, cafes and other services will open on the first floors. To go grocery shopping, buy a coffee or take a pizza to go, it will be enough to go down the elevator.

From Polyarnaya 25 you can walk to the Yauza park, the longest in Europe, in half an hour. And on a scooter to the park – only 12 minutes. There are walking and bicycle paths, playgrounds, playgrounds, picnic areas and a dog training area. The park has unusual sports facilities, such as a skate park and a go-kart track. And in 15 minutes by car there is a picturesque estate Sviblovo.

Project video

View all

Project features The height of the houses in Polyarnaya 25 and the distance between them are chosen so that there is a lot of sunlight in the apartments and yards. Shops and cafes are located on the ground floors.
There is a lot of greenery in the park yards, there are benches, tables and playgrounds. For cars, there are two multi-level above-ground parking lots.
Polyarnaya 25 will have two kindergartens, one of which is already working for 300 kids, and a school with an IT lab.

Life in Polyarnaya 25

Everything is nearby: there are shops, shopping centers, the Ladoga cinema and the Mechta Ice Palace around Polyarnaya 25. On foot you can walk to a landscaped park near the Chermyanka River – this is a great place for outdoor recreation. There are also four parking lots for electric scooters – they can quickly get to the metro, the Yauza park or the Globus hypermarket.

Layouts

Polar 25 offers a wide range of layouts: from compact studios to apartments for large families. You can buy an apartment with a finished finish – and immediately move. 9View 4 offers

Tours

Visit the project, get to know our building standards and imagine your life in the new area.

Sign up for a tour

You can choose the date and time, the tour lasts about an hour.

You will be met by a guide

Will show you courtyards, children’s and sports grounds, an apartment with decoration and furniture.

Construction progress

Nearest settlement: August 15, 2023, Building 3

Watch the construction of
live

Video review

Filmed on July 12, 2023

900 06

In addition to apartments

281 premises leftStorage premises

Premises with an area of ​​72 m²Commercial real estate

Project news

View all

May 25, 2023

Start of sales of pantries in building 2. 1

On May 24, sales of pantries with finishing in building 2.1 of the Polyarnaya 25 project began.

May 17, 2023

A kindergarten for 220 children will appear in Polyarnaya 25

The construction of a kindergarten for 220 children has begun in the residential area of ​​Polyarnaya 25.

April 28, 2023

Subscribe to the auction for the sale of storerooms in the Polyarnaya 25 project

On May 5, the sale of storerooms in the Polyarnaya 25 project will begin.

Developer documentation

Similar projects

Green park

Botanical garden

15 min

from 9 206 030 ₽

Kola 8

Sviblovo 90 003

from 7 412 750 ₽

All projects

My district. Biryulyovo East and West, Moskvorechye-Saburovo, Tsaritsyno

My district. Biryulyovo East and West, Moskvorechye-Saburovo, Tsaritsyno

Four districts in the south that became part of Moscow in 1960th year. Industrial, with a rich history and its own identity.

Home for over 450,000 Muscovites. Improving their quality of life is the main goal of the development programs carried out in these areas over the past decade.

* * * *

Transport

For many years, the main problem of Biryulyovo East and West, Moskvorechye-Saburov and Tsaritsyn was the lack of transport links. And not only with the city center, but also among themselves.

To improve the situation, we have implemented several major projects.

We built overpass across the Paveletsky direction of Moscow Railways , connecting streets of Podolsky Kursantov and Elevatornaya . But in fact, it connected East and West Biryulyovo.

The overpass became the key structure of the new highway Elevatornaya Street – Podolskikh Kursantov Street – Krasny Mayak Street , which connected Lipetskaya Street with Varshavskoye Highway and became an alternate for Moscow Ring Road in the southern sector of the city.

Previously, in order to get from one area to another, drivers had to go to the Moscow Ring Road, making a detour through traffic jams 5-7 km long. Thanks to the new understudy, the travel time between neighboring areas has been reduced by 3-4 times.

At Lipetskaya Street – the main thoroughfare of Biryulyovo Vostochny – a 600-meter flyover of direct running was opened. Side passages were created along it for a comfortable exit to Lipetskaya Street from Elevatornaya and 6th Radialnaya Streets. U-turns and exits were organized in the underpass space.

The construction of the overpass increased the capacity of Lipetskaya Street by 25-30%, thus reducing the intensity of traffic congestion and simplifying the exit from Moscow to the Don federal highway.

In the area of ​​st. Lipetskaya, 34/25, the noise barrier was updated – instead of old panels, modern ones with improved sound insulation were installed.

Podolskikh Kadsantov Street was extended to MKAD with a modern interchange. Thus, residents of Biryulyovo Zapadny received an additional entrance/exit to the Moscow Ring Road.

Reconstructed Kashirskoe shosse from MKAD to Varshavskoe shosse.

Three more large projects are underway, which will radically improve the traffic situation in the south of the city. Two of them are chord highways that form a new transport frame of the capital.

This is Southern Rocade , already built from MKAD to Proletarsky Prospekt.

This is Moscow high-speed diameter – we plan to complete the construction of the southern direction this year.

The opening of the Southern Rokada and the southern direction of the MSD will provide residents of Biryulyovo, Moskvorechye-Saburov and Tsaritsyn with many new – fast and convenient – options for traveling around the city. The most important effect is that the metropolis will become closer.

Finally, the third large-scale project that is currently underway is the reconstruction of interchange at the intersection of Lipetskaya Street and MKAD . The most complicated transport hub – in total it is planned to build almost 19 km of roads, including 8 artificial structures.

In January of this year, the first section was opened – the outer side of the Moscow Ring Road with an exit to the M-4 highway. In general, we plan to commission the interchange in 2024. As a result, traffic will be improved on one of the busiest sections of the Moscow Ring Road, as well as in Biryulyovo and other adjacent areas.

Rail transport is actively developing.

On the basis of the Kursk direction of the Moscow Railway, traffic was launched along MCD-2 . Passengers are accepted by stations Moskvorechye , Tsaritsyno , Pokrovskoe , Krasny Stro At rush hour, new, comfortable surface metro trains run every 5-7 minutes.

This spring, Big Circle Line of the metro was fully launched. It included stations Kashirskaya and Varshavskaya “, previously serving the Kakhovskaya branch. This was preceded by their reconstruction.

Specialists preserved the historical appearance of the stations as much as possible, while modernizing the infrastructure, replacing utilities, rails, wall cladding and platforms. In fact, the stations were dismantled and reassembled, completely updating the main structures and equipment, taking into account advanced engineering technologies.

Kashirskaya “,

Warsaw “.

Territories adjacent to the stations have been landscaped – it is convenient to go to the metro and just take a walk.

Our plans include the construction of Biryulyovskaya metro line, which will stretch south from the former ZIL industrial area. The prospective radius will be connected by interchanges with BKL, MCC, Zamoskvoretskaya and Troitskaya metro lines.

29 new urban land transport routes serve to develop inter-district transport links. For the convenience of passengers, 165 modern stopping pavilions have been installed.

Fans of cycling actively use the bicycle infrastructure. They have 48 car parks and 27 two-wheeler rental stations.

* * * *

Landscaping

Tidying up existing parks and creating new outdoor recreation areas is the task of creating a quality public space. In the south, it is being successfully solved.

Landscaping of Orchard was completed, where there is more greenery, places for active and quiet recreation.

Skate park, pump track and other activities attract children and youth at park e Pines . There is something to admire, fans of topiary art.

Updated Fruit Park bright and cozy.

Several recreation areas near the water have been landscaped.

Chertanovka river valley.

Square at Bulatnikovskaya street .

Landscaped area around Korneevsky ponds .

Upper and Lower Biryulevsky Ponds .

New pedestrian zones have been equipped – along Kashirskoye Highway from 51, building 5 to 59, building 2,

from st. Zagoryevskaya to the projected passage No. 6133 .

Among the well-maintained iconic objects is a recreation area at Borisov Ponds , landscaped areas along Kavkazsky boulevard from the street. Bekhterev to st. Kantemirovskaya, between Shipilov proezd and Kashirskoe highway .

We pay great attention to the development of Biryulevsky arboretum . A unique park-nursery was established in 1938 to select tree species most resistant to the Moscow climate. It was severely damaged by freezing rain in 2010. Over the past decade, much has been done to restore plantings and expand the collection.

In addition, the reconstruction of the ponds of the arboretum, the construction of the amphitheater and the embankments of the Biryulevsky Creek were completed.

This year we took on a few more iconic objects. Among them – square near DK Moskvorechye and park named after. Herzen .

* * * *

Social infrastructure

The educational system was replenished with several new buildings, which have all the conditions for study and education, communication and recreation, creative and sports activities.

Kindergartens – at st. Yagodnaya, 14, building 1 ,

Kashirskoye sh., 38, building 2.

School on the street. Mikhnevskaya , 8, building 2.

Annex to the school in Vostryakovsky pr.

In addition, in Moskvorechye-Saburovo, construction was completed two buildings 0162 objects under the program to stimulate the creation of places of employment. The investor built a school for 900 students and a kindergarten for 160 children.

School.

Kindergarten.

Construction is underway kindergarten on the street. 6th Radial, vl.7.

In the south of the capital there is a traditionally strong system of additional creative education for young Muscovites. And thanks to the project “Art for Children”, she received a new impetus for development.

Among the more than 150 buildings of art schools renovated in the city – Det Music School No. Elevatornaya, 6/4,

Children’s Music School No. 4 on the street. Bekhtereva, 27,

Children’s Art School Kantemirovskaya, 15/2,

Children’s Art School. S.T. Richter on Kashirskoe sh., 42, building 3

and st. Kantemirovskaya, 20, building 5.

Thanks to the modernization of the creative education system, the competition at Moscow art schools has doubled.

This year we are completing a large-scale program of comprehensive reconstruction of the outpatient department. Modernization covers 201 polyclinics – almost half of the outpatient fund of the capital.

Works completed in 92 buildings, which are reopened to receive patients.

Among them, two clinics in these areas – branch No. 1 of polyclinic No. 52 (Ryazhskaya St., 13 ) ,

branch No. 2 of the children’s polyclinic No. 23 (St. Timurovskaya, 3) .

Work continues in branch No. 2 ( Bulatnikovsky pr. 163 , branch No. 1 children’s clinic nicks No. 98 ( Bulatnikovsky pr -d, 16A) . As well as branch No. 3 of polyclinic No. 210 (Koshkina street, 21) and the head building of this clinic, which also houses children’s clinic No. 145 (Kashirskoye sh., 57, building 1) .

ambulance substation was built for 20 parking spaces on the street. Promyshlennaya, 12, building 1.

Construction of flagship center of the State Clinical Hospital im. V.M. Buyanova on Baku street. It is designed to provide patients with emergency medical care according to a new standard, which is based on unified medical algorithms, highly professional doctors, the most modern equipment, advanced technologies, and care for patients and their loved ones. The flagship center will use the Triage digital patient assessment system, introduce the doctor-to-patient principle, and equip high-tech operating rooms.

The construction of children’s polyclinic with a trauma center on the street is being completed. Lebedyanskaya, vl. 33 and of the children’s and adult polyclinic on 6th Radialnaya St., vl. 7, room 36.

Moscow Longevity Center on Medynskaya street, 11A is open for residents of the older generation. People come here to do interesting things, discover something new and, of course, communicate with like-minded people.

The same club space will be created on the street. Kantemirovskaya, 9.

Overhaul of the Territorial center of social services Tsaritsynsky .1) .

We are implementing many projects to improve the quality of social services for Muscovites who need special care from the city. One of them is “City boarding houses of a new type”.

In place of traditional closed neuropsychiatric boarding schools, we are creating open and friendly social homes, in which adults with mental disabilities get much more opportunities for an interesting and meaningful life, including communication with the outside world, creative activities and much more.

An example of such a transformation is two buildings in С social om house e « Moscow speech 90 163 » in the Moskvorechye-Saburovo area. Cozy living rooms, studios and workshops, medical units, accessible environment.

As part of the modernization of the sports infrastructure, the facade of the Moscow Complex Sports School of the Olympic Reserve was overhauled South

a sports complex with tennis courts on 6th Radialnaya Street was built from lightweight structures.

An artificial ice skating rink was opened at the address: Kashirskoye shosse, 76, building 4. Nearby there is a workout area with simulators for all muscle groups.

This year it is planned to complete the repair of sports facilities Mos Moscow State University of Sports and Tourism 162 Chertanovo

Construction in progress 4 FOKov on the street. Medynskaya, vl.6, building 1; st. Bulatnikovskaya, vl.2; st. Lipetsk, industrial zone “Lenino”; Kashirskoye highway, 51, building 1.

Multifunctional sports complex will be built on the street. Moskvorechye, 4, building 1 and reconstructed stadium Ogonyok on the street. Sportivnaya, d.2.

Public centers created during the reconstruction of former cinemas have become new points of attraction for residents. This is “ Elbrus ” on Kavkazsky Boulevard,

Biryusinka ” on Bulatnikovskaya street.

The former cinemas “ Kerch ” on Biryulevskaya street and “ Mechta ” on Kashirskoye highway.

Residents liked fairgrounds .

St. Moskvorechye, vl.14 .

Proletarsky Ave, vl.24.

St. Lipetskaya, 48.

Bulatnikovsky

* * * *

Renovation

The Renovation Program included 184 houses in which 42,000 Muscovites live.

In 2019, the first new settlers began to move to a beautiful and comfortable new building at st. Bori sovskie prudy, 7, building 2 .

Today 9 more new houses are being settled. Among the addresses –

st. Zagoryevskaya , 2, building 1 ,

Bulatnikovsky Ave., 16B ,

Kharkivsky pr. , 1/1, k . 1,2,3 ,

Kantemirovskaya st., 27A ,

Kaspiyskaya st., 28/4 ,

Kantemirovskaya st., 39A ,

Kavkazsky Boulevard, 40 ,

st. Bekhtereva, 3A ,

st. Yerevanskaya, 8 .

* * * *

LCD “Tsaritsyno”

This year, the construction of the Tsaritsyno residential complex, the largest problematic facility in Moscow, was completed: 14 buildings with a total area of ​​​​about 650 thousand square meters. meters.

The rights of about 5 thousand defrauded equity holders have been restored. Now they are receiving the keys to the apartments in the completed buildings. At the same time, social infrastructure is being built here.

Housing 1.

Case 2.

Housing 5.2.

Housing 27 .

Housing 28/29 .

* * * *

Reorganization of former industrial zones

The area near the intersection of Moskvorechye Street and Proletarsky Prospekt is subject to comprehensive development.

Now there are warehouses, car services and parking. Instead, it is planned to build about 168 thousand square meters. m of modern residential development – the houses will be transferred for settlement under the Renovation Program. A new kindergarten, school, shops, cafes and other facilities needed in everyday life will also open on the site.

The implementation of the project will give the city almost 370 new jobs.

Another 430 jobs will appear in the shopping center, which is being built in Biryulyovo Vostochny on Elevatornaya Street under the program to stimulate the creation of work places.